- Entry date 15.12.2023 Condition monitoring at maintenance Dortmund on February 21st and 22nd, 2024
- Entry date 22.08.2023 Condition Monitoring at HUSUM WIND 2023
- Entry date 16.06.2023 Is condition monitoring even worth it?
- Entry date 05.07.2022 Analysis of the foundation movement on wind turbines
-
WindEnergy Hamburg 2024
24.09.2024 - 27.09.2024
-
05.11.2024 - 07.11.2024
Integrated Condition Monitoring solutions on Wind Energy Denmark
Wind Energy Denmark 2018Together with Beckhoff Automation, we are presenting our solutions for control-integrated Condition Monitoring.
The Peakanalyzer with all its functions can also run as an integrated system on the Beckhoff TwinCAT 3 environment. This option is interesting for wind turbines that already have a control on the same hardware platform. Then only the installation of the necessary sensors and signal input terminals is necessary.
The speed and other process information, e.g. wind speed and power can be used directly from the controlling system. This saves unnecessary redundant sensor technology. The condition monitoring software runs as an additional task on the controller. The integration also allows the existing communication infrastructure to be used to configure the condition monitoring system or to download the data.
Your contact person is Mr. Kai Uchtmann.
Archive - 2023
-
Modified date 2023/12/15
Condition monitoring at maintenance Dortmund on February 21st and 22nd, 2024
-
Modified date 2023/08/22
Condition Monitoring at HUSUM WIND 2023
-
Modified date 2023/06/16
Is condition monitoring even worth it?
Archive - 2022
-
Modified date 2022/07/05
Analysis of the foundation movement on wind turbines